< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=554848196168170&ev=PageView&noscript=1"/>
You are here: Home » Products » Filling » Water Filler for 5 Gallon Bottle » 5gallon Water Filling Line 18.9Ldrinking water filling production line for 900BPH

loading

Share to:
sharethis sharing button

5gallon Water Filling Line 18.9Ldrinking water filling production line for 900BPH

General Description
nsistent and accurate filling, high efficiency, stable operation, and easy maintenance. The 5-gallon water filling line is designed to meet the demands of large-scale production, with a capacity of 900 bottles per hour.
Availability:
Quantity:
  • TXG-

  • Sunswell

General Description

nsistent and accurate filling, high efficiency, stable operation, and easy maintenance. The 5-gallon water filling line is designed to meet the demands of large-scale production, with a capacity of 900 bottles per hour.

详情8

Model
QGF-300
QGF-450
QGF-600
QGF-900
QGF-1200
QGF-1500
QGF-2000
Capacity
(BPH/5 Gallon)
300
450
600
900
1200
1500
2000
Main Equipments:
2

Cap Elevator

3

  Cap Unscrambler


4

Cap Decapper


5


This production line is specifically designed for filling 18.9L drinking water bottles. It ensures that each bottle is thoroughly cleaned and sterilized before the filling process begins. The automatic loading system efficiently transfers the bottles to the filling station, where they are accurately filled with water. The capping system securely seals each bottle, preventing any leakage or contamination.

6

Brush External Bottle Washer


7


To ensure the highest quality of the filled water, the production line incorporates a heat shrinking system that tightly seals the caps and prevents any tampering. Additionally, the line includes a bagging system that neatly packs the filled bottles for easy transportation and storage.

The 5-gallon water filling line operates with utmost precision and efficiency. Its advanced technology guarantees consistent filling levels, minimizing any wastage of water. The line is also equipped with sensors and control systems to detect and resolve any issues during the production process, ensuring a smooth and uninterrupted operation.

Maintenance of the production line is made simple, thanks to its user-friendly design. The components are easily accessible for cleaning and maintenance purposes, reducing downtime and optimizing productivity.


10

Linear Filling Valve

11

Rotary Filling Valve


12

Capping Machine

13


Procedure:

With its professional and reliable performance, the 5-gallon water filling line is the ideal solution for businesses looking to meet the high demand for 18.9L drinking water bottles. Its ability to handle large-scale production, combined with its efficient and accurate filling process, makes it a valuable asset for any water bottling operation.
14

Automatic Neck Labeling Machine

15


16

Automatic Neck Labeling Machine

17


18

Visual Inspection

19

Bottle Conveyor Belt

45sunswellcn-产品详情页_06sunswellcn-产品详情页_07sunswellcn-产品详情页_11sunswellcn-产品详情页_03

FAQ
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and
packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.
Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to
save international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

Any more questions, pls feel free to contact me !




Previous: 
Next: 
+8613921964455
No. 5, Shuangfeng Rd., Zhaofeng, Zhangjiagang, Jiangsu 215600, China
 © 2018 Sunswell Machinery  All rights reserved.  Site Map    ICP备案号:苏ICP备2022013671号